Shenzhen Hongdali Machinery Co.,Ltd

Home> Industry Information> Preparation before operation of belt assembly line equipment

Preparation before operation of belt assembly line equipment

October 21, 2019

Belt Assembly Line is a kind of automatic equipment, which is mainly used in industrial production and is very common in factory operation. General belt assembly line equipment needs to be checked before operation to ensure the stability of the equipment. So what preparation work should be done before the belt assembly line equipment runs?



First point: turn on the main power switch, check whether the power supply of the belt assembly line equipment is normally fed in and whether the power indicator is on. Proceed to the next step after normal operation. When the belt assembly line stops running, press the stop button to cut off the main power supply after the system stops completely.



The second point: start each electrical equipment in sequence according to the process flow, and start the next electrical equipment after the previous electrical equipment starts normally (the motor or other equipment has reached the normal speed and normal state).



Third point: turn on the power switch of each circuit and check whether the belt assembly line equipment is normal. Under normal condition: the equipment does not operate, the belt line operation indicator light is not on, the power indicator light of frequency converter and other equipment is on, and the display panel of frequency converter displays normally (no fault code display).



The preparation work that should be done before the operation of the belt assembly line equipment is here for you. We have to do all the preparation work before the belt assembly line equipment works, so that there will be no failure in the process of work, and the work will be more smooth.

http://www.conveyortop.com


Belt Conveyor 53

The above is the Preparation before operation of belt assembly line equipment we have listed for you. You can submit the following form to obtain more industry information we provide for you.

You can visit our website or contact us, and we will provide the latest consultation and solutions

Share to:

Send Inquiry

Home> Industry Information> Preparation before operation of belt assembly line equipment

Send Inquiry

Shirley Mon

Ms. Shirley Mon

Email:

Send Inquiry

Tel:86-755-89459585

Fax:86-755-89459686

Mobile Phone:+8613424296707Contact me with Whatsapp

Email:

Address:No. 10 New Xinbu Road, Tongle Town, Longgang District, Shenzhen, Guangdong

Mobile Site

Home

Product

Whatsapp

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send